We have the experience to make your project a success. After 25 years, our project list is extensive. Please select an area of interest.
![page-angle](http://www.eri.consulting/wp-content/themes/eresources/img/page-angle.png)
Projects
Veteran's Memorial Bridge
US27 over St. Mary's River
INDOT - Fort Wayne District
Fort Wayne, IN
- Signature structure carrying vehicular traffic out of downtown Fort Wayne
- Deck replacement with barrier separated, widened sidewalks
- Numerous architectural features including: artwork commemorating the branches of the armed forces, arches spanning the roadway and sidewalks, and custom LED lighting
- Memorial plaza with custom signage and "The Beacon" centerpiece sculpture
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0018-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0003-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0466-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0465-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_1-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_IMG_9591-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_IMG_9593-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_IMG_3605-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/9_IMG_3616-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/10_IMG_3618-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/11_DJI_0017-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/12_DJI_0999-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/13_DJI_0473-EDITED.jpg?resize=810%2C487)
Parker-Cole Crossing
PFW (f/k/a IPFW) Bridge over
Coliseum Blvd
Fort Wayne, IN
- Connects PFW and Ivy Tech campuses, spanning one of Fort Wayne's busiest thoroughfares
- Cable Stay Bridge with single, inclined pylon
- Programmable, color changing LED lighting system illuminates the bridge from end to end, top to bottom
- Unique 97 degree turn in deck between ramp and main span
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0646-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_IMG_4807-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_IMG_4720-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0651-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0652-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0657-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_IMG_4724-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_IMG_4770-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0646-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_IMG_4807-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_IMG_4720-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0651-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0652-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0657-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_IMG_4724-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_IMG_4770-EDITED-scaled.jpg?resize=810%2C487)
FlexJet Operations Center
Cleveland, OH
- Sloping columns throughout the perimeter of the building to create dramatic sloped architectural facades
- Cantilevered steel roof members to support extended rooftop elements pointing outward in multiple directions
- Laterally supported by steel braced frames
- Two story steel framed building with a partial basement
- $20 million construction cost
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/07-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/08-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/05-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/07-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/08-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/05-EDITED-scaled.jpg?resize=810%2C487)
The Pearl
Fort Wayne, IN
- 2 levels of post-tensioned concrete for the podium structure with staged stressing of tendons
- 5 levels of load bearing cold formed steel walls above the podium with composite open web steel joists
- Elevated parking deck on the first level of post-tensioned concrete (flat slab construction)
- Post-tensioned transfer beams above the first level event space and commercial spaces
- Laterally supported by concrete shear walls
- $65 million construction cost - mixed use development
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/2-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/5-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/4-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/3-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/1-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/2-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/5-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/4-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/3-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/1-scaled-1-scaled.jpg?resize=810%2C487)
SIMCOM Aviation Training Facility
Lake Nona, FL
- Multiple second level elevations providing access to the full motion flight simulators
- Laterally supported by steel braced frames in various structural configurations to accommodate architectural and mechanical openings throughout the facility
- Two story steel framed building
- $40 million construction cost
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/05-EDITED-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/01-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/02-EDITED-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/03-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/05-EDITED-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/04-EDITED-scaled-2-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/06-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
Promenade Park
Riverfront - Fort Wayne, IN
Structural Design
- Design of Tree Canopy Trail with H-pile deep foundation system
- Design of Compass Pavilion and double-sided band shell
- Retaining wall design throughout park and seawalls on north and south side of river utilizing H-pile deep foundation system
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
Skyline Tower
Fort Wayne, IN
- Twelve story + penthouse building (5 structural steel, 8 load bearing cold formed steel wall panels).
- Concentric steel braced frames extend full height for lateral support.
- Rammed aggregate piers with uplift capacity at braced frames.
- Composite steel bar joists used for Levels 6-12.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_4946.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/DJI_0952-copy.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Skyline-10-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Composite-TEST-PORPORTIONAL-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5862.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5866.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5552.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_4946.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/DJI_0952-copy.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Skyline-10-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Composite-TEST-PORPORTIONAL-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5862.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5866.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_5552.jpg?resize=810%2C487)
Promenade Park
Riverfront - Fort Wayne, IN
Civil/Site Design
- Site utility design for storm & sanitary sewer, domestic water, and site fire protection
- Site grading design, providing positive drainage and in accordance with ADA standards
- Compensatory cut/fill plan with cross sections and floodplain coordination
- Hydraulic modeling of the river
- Harrison Street reconstruction design plan & profile
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/First-RF-Photo-11-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184838470_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Third-RF-Photo-15-PNG.png?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_184854598_HDR-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Fifth-RF-Photo-06-PNG.png?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185900030_HDR.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Seventh-RF-Photo-08-PNG.png?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_20190809_185056560-horiz.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/06/Ninth-RF-Photo-01-PNG.png?resize=810%2C487)
Parlor City Plaza
Bluffton, IN
- Lead designer of the $1.1 million project that has been a catalyst for additional downtown improvements in Bluffton.
- Provided a multi-use space for activities while enhancing the entrance into the Wells County Courthouse.
- This plaza provides a combination of hardscape and softscape elements to promote flexibility and charm.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0027-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0015-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/Landscape-Arch-Services-Bluffton-Plaza-DJI_0027-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0031-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/night-time-picture-scaled-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0027-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0015-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/Landscape-Arch-Services-Bluffton-Plaza-DJI_0027-scaled-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0031-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/night-time-picture-scaled-1.jpg?resize=810%2C487)
Warrior Park
Fort Wayne, IN
Civil/Site Design
- Converted a nine hole golf course into Indiana Tech’s athletic campus.
- Synthetic turf softball field.
- Collegiate Track & Field complex
- Compensatory Floodplain storage
- Stormwater management and water quality design
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0623-Edit-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0615-Edit-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0603-Edit-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0630-Edit-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0623-Edit-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0615-Edit-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0603-Edit-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/11/DJI_0630-Edit-scaled.jpg?resize=810%2C487)
Indiana Tech University
Fort Wayne, IN
- Snyder Academic Center
- Cunningham Business Center
- Indiana Tech West
- Andorfer Commons
- Warrior Athletic Center, Athletic Fields, & Warrior Fieldhouse
- Wilfred Uytengsu, Sr. Center
- Warrior Row Student Housing
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0050-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0505-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0464-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0037-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0007-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0489-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0012-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0028-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0050-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0505-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0464-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0037-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0007-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0489-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0012-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0028-EDIT-RESIZE.jpg?resize=810%2C487)
Purdue University
Fort Wayne
Fort Wayne, IN
- Student Housing
- Student Services and Library Complex
- Alumni Center
- Parking Garage III
- Parking Lots and Perimeter Road Improvments
- Sanitary Sewer and Water Main Improvements
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0399-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0387-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0395-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0409-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0435-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0416-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0426-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0399-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0387-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0395-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0409-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0435-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0416-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0426-EDIT.jpg?resize=810%2C487)
PFW (f/k/a IPFW) Bridge over
St. Joseph River
Fort Wayne, IN
- Part of River Greenway Trail System
- Cable Stay Bridge with Pylons
- Extensive lighting design
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IPFW-WestSide-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IPFW-Bridge-Night.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/pic3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Pic2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/pic4-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IPFW-WestSide-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IPFW-Bridge-Night.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/pic3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Pic2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/pic4-EDIT.jpg?resize=810%2C487)
PFW (f/k/a IPFW) Bridge over
Crescent Ave
Fort Wayne, IN
- Landmark bridge for the IPFW Campus
- Connects main campus to residence housing
- Covered cable stay bridge
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0651-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/DSC02279-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0140-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0137-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0651-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/DSC02279-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0140-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_0137-EDIT.jpg?resize=810%2C487)
Hillegas Road over US30/US33
INDOT - Fort Wayne District
- 3 - 72 ft spans using
composite prestressed
concrete bulb-tee beams - Increased underclearance to US30/US33 by 2.5 ft
- Eliminated southern span by utilizing MSE wall
- Traffic was maintained on US30/US33 throughout project
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/01/DJI_0998-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/01/DJI_0988-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040611-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040621-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040629-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040633-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/01/DJI_0998-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/01/DJI_0988-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040611-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040621-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040629-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/01/P1040633-EDITED.jpg?resize=810%2C487)
Winters Road Extension
Allen County Highway Department
- Extension of Winters Road on new alignment
- Established a new entrance to General Motors Fort Wayne Assembly Plant
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/9-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/9-EDIT-RESIZE.jpg?resize=810%2C487)
CR 900 N / Lafayette Center Road over Norfolk Southern Railroad
INDOT LPA Project for
Huntington County
- 120' single-span composite prestressed concrete bulb-tee beam superstructure
- Integral end bent substructure with MSE walls
- Rammed aggregate piers below MSE wall envelope
- Design included railroad coordination
- Wick drains utilized in embankments to accommodate geotechnical requirements
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-5.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-5.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-4.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-5.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-1.jpg?resize=810%2C487)
Rotary Centennial Park
Huntington, IN
- New urban park for Rotary Club of Huntington, IN.
- Large outdoor plaza with raised marble fountain.
- Incorporated entry arch, Victorian clock, and marble checker board tables along with parking for 15 vehicles.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0455e.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0445-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0453e.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0442.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0451-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1344-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0455e.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0445-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0453e.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0442.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0451-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1344-EDIT.jpg?resize=810%2C487)
Saint Francis
School of Creative Arts Parking Lot
Fort Wayne, IN
- New plaza including hardscape paving and extensive landscaping
- Incorporated sculptures and artwork into the design
- New parking lot with screening
- Expanded existing detention basin for stormwater runoff
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1268-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1256-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1287-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1251-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1245-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1244-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1268-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1256-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1287-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1251-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1245-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1244-EDIT-RESIZE.jpg?resize=810%2C487)
Huntertown WWTP
- Design of a new 1.5 MGD Wastewater Treatment Plant
- Effluent force main and outfall structure
- An SRF Funded project
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/2017-05-N-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170705_094257-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170412_093358-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20161109_093939-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/huntertown1-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170426_094116-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20161109_093421-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/2017-05-N-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170705_094257-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170412_093358-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20161109_093939-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/huntertown1-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20170426_094116-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/20161109_093421-EDIT.jpg?resize=810%2C487)
Stonebridge Business Park- Sewer Collection
- Municipal utility extensions for 192 acre commercial / industrial business park
- 5,200 LF gravity sanitary sewer
- IDEM public sewer main permitting
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6173-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6172-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6451-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6532-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6537-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6173-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6172-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6451-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6532-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6537-EDIT.jpg?resize=810%2C487)
Parkview Field
Fort Wayne, IN
- New facility over $30 million
- Unique designs for netting, light poles, etc.
- Balcony overhang seating
- Structural steel framing with braced bays
- Numerous concrete retaining walls for tiered seating
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_3804-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IMG_0439-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/webcam-image-first-night-4-16-09-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IMG_1953-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_3804-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IMG_0439-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/webcam-image-first-night-4-16-09-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/IMG_1953-EDIT.jpg?resize=810%2C487)
Tippecanoe
- Numerous concrete retaining walls with multi-tier waterfall feature
- Paver plazas
- Tram system and Gazebo
- Extensive plantings through out
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/tipp-new-1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/tipp-new-2-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/tipp-new-1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Tipp3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/tipp-new-2-EDIT.jpg?resize=810%2C487)
Parkview Hospital
- “The Spirit of Women - The Gardens of Life” courtyard
- Special hardscape pavers
- Quote walls and stepping stones
- Fountain, statues, and benches
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-012-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-004-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-009-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-021-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-012-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-004-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-009-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Parkview-Courtyard-6-16-08-021-EDIT.jpg?resize=810%2C487)
Van Buren Street over St. Mary's River
City of Fort Wayne
- Bridge superstructure replacement
- Prestressed concrete bulb tee beams
- USACE Floodwall modified on the northwest bank
- Decorative lighting and railing used to incorporate historical architectural theme
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0783-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0790-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0787-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_P1050761-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0777-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0788-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0783-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0790-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0787-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_P1050761-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0777-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0788-EDITED.jpg?resize=810%2C487)
I-69 & Coldwater Road Interchange
INDOT - Fort Wayne District
- Multiple projects at the I-69 & Coldwater Road Interchange in Fort Wayne
- Bridge Replacement, Two Bridge Deck Overlays
- HMA Overlay & Interchange Modification
- Maintenance of Traffic utilizes a combination of lane shifts, closures (with full ramp closure), runarounds, crossovers, and a temporary signal
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0432-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0438-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0055-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0058-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0050-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0051-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0439-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_DJI_0446-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/9_DJI_0452-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/10_DJI_0445-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/11_DJI_0433-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0432-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0438-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0055-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0058-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0050-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0051-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0439-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/8_DJI_0446-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/9_DJI_0452-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/10_DJI_0445-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/11_DJI_0433-EDITED.jpg?resize=810%2C487)
I-469 Over Lafayette Center Road
INDOT - Fort Wayne District
- Bridge Superstructure Replacement
- Phased Interstate Maintenance of Traffic utilizing crossovers
- Prestressed concrete bulb tee beams
- Clear deck forms
- NExT concrete sensor technology in the deck
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0914-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0902-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_IMG_0360-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_IMG_2100-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_IMG_2117-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0025-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0655-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0914-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0902-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_IMG_0360-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_IMG_2100-EDITED-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_IMG_2117-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0025-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0655-EDITED.jpg?resize=810%2C487)
I-469 East End Bridge Deck Overlays
INDOT - Fort Wayne District
- Rigid bridge deck overlays and semi-integral end bent conversions on 7 bridges in the Fort Wayne District
- Phased Interstate Maintenance of Traffic utilizing crossovers
- I-469 over Maumee River, I-469 over Norfolk Southern Railroad, I-469 over Dawkins Road, & Stellhorn Road over I-469
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0672-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0686-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0057-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0675-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0717-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0718-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0672-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0686-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0057-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0675-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0717-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0718-EDITED.jpg?resize=810%2C487)
I-69 Over Walnut Creek
INDOT - Fort Wayne District
- Superstructure replacement on I-69
- Maintenance of Traffic utilized runaround with the use of a prefabricated temporary steel truss structure in the median
- Temporary causeway installed for placement of scour countermeasures
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0817-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0819-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0040-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0037-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0820-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0817-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0819-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0040-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0037-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0036-EDITED-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0820-EDITED.jpg?resize=810%2C487)
US 6 Over Turkey Creek
INDOT - Fort Wayne District
- Bridge Deck Overlay on US6 over Turkey Creek
- Temporary signal utilized to maintain traffic during construction
- Temporary causeway installed to place scour countermeasures
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0758-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0089-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0085-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0073-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0071-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0939-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0951-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/1_DJI_0758-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/05/2_DJI_0089-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/3_DJI_0085-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/4_DJI_0073-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/5_DJI_0071-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/05/6_DJI_0939-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/05/7_DJI_0951-EDITED.jpg?resize=810%2C487)
The Bradley
Fort Wayne, IN
- Floor utilizes girder slab system with hollow core planks and special steel beams
- Rooftop patio and pergola
- Laterally supported by precast shear walls
- Five story steel framed building
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0011-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0013-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0020-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_6224-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_6219-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0025-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0011-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0013-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0020-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_6224-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_6219-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0025-EDITED-scaled.jpg?resize=810%2C487)
Fort Financial Headquarters
Fort Wayne, IN
- Two story clear atrium in the main lobby
- Designed for rooftop mechanical screenwalls and solar panels
- Laterally supported by steel braced frames
- Two story steel framed building
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0428-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0418-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8814-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8806-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8808-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0428-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/DJI_0418-EDITED-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8814-EDITED-scaled.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8806-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8808-EDITED.jpg?resize=810%2C487)
Trine University Engineering Building
Angola, IN
- Three story clear atrium along north side of building
- Multiple floor heights and entrances to accommodate due to sloping grade
- Laterally supported by steel braced frames
- Three story steel framed building
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8786-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8787-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8790-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8784-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8788-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8786-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8787-EDITED-scaled-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8790-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8784-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2024/01/IMG_8788-EDITED-scaled-1-scaled.jpg?resize=810%2C487)
Willow Creek Culvert at
State Road 3
Allen County, IN
- Installation of 190ft of 60in culvert, installed by jack and bore method under State Road 3
- Restored hydraulic capacity of the ditch
- Associated earthwork, erosion control measures, and surface restoration
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/IMG_1473-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/20191017_104243-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/20191017_101309-EDITED.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2023/12/IMG_1473-EDITED.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2023/12/20191017_104243-EDITED.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2023/12/20191017_101309-EDITED.jpg?resize=810%2C487)
CR 500 W over Eel River
Whitley County Bridge No. 95
- Bridge replacement project to allow for easier passage of river debris
- 3-span continuous reinforced concrete slab bridge
- Wide central span necessitated haunched supports
- Road straightened adjacent to the bridge
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050518-Edit.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050520-Edit.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050523-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050526-Crop-Edit.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050518-Edit.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050520-Edit.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050523-Edit.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2020/12/P1050526-Crop-Edit.jpg?resize=810%2C487)
Harrison Street Bridge
City of Fort Wayne
- Bridge rehabilitation project in conjunction with construction of Fort Wayne's riverfront Promenade Park
- Sidewalks widened, providing an improved pedestrian link between the two sides of the park
- Aggregate selections for the polymeric concrete overlay were made to create three distinct surfaces
- Existing abutments converted to semi-integral, eliminating the expansion joints
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/DJI_0950-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/DJI_0952-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_2859-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/DJI_0950-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/08/DJI_0952-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/08/IMG_2859-EDIT.jpg?resize=810%2C487)
Parkview Hospital - Randalia
Fort Wayne, IN
- Design of new drop off drive with overhead canopy and curbside access
- Patio areas and exterior gathering space to compliment the building
- Relocation of existing utility infrastructure
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0438-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0444-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0448-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0449-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0436-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0438-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0444-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0448-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0449-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0436-EDIT.jpg?resize=810%2C487)
Vera Bradley
Fort Wayne, IN
- Project included a 200,000 sf warehouse addition with extensive loading area with 20+ truck docks
- New utility main extensions and future expansion analysis
- Design of dual decorative wet ponds used for storm water detention and water quality requirements
- Expanded parking, hardscape, and landscape design
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0258-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0266-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0247-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0305-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0258-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0266-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0247-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DSC_0305-EDIT.jpg?resize=810%2C487)
Jackson R. Lehman YMCA
Fort Wayne, IN
- Site design included parking for 400+ vehicles with complementing walks and hardscaping
- Asphalt pedestrian trail system surrounding the development
- Exterior recreation area for children
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DJI_0012.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DJI_0021.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/100_8641.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DJI_0012.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/DJI_0021.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/100_8641.jpg?resize=810%2C487)
South Anthony Blvd.
over Maumee River
Allen County Bridge No. 363
- Superstructure replacement and deck widening to accommodate pedestrians and bicycles
- Decorative lighting and railing used to incorporate historical architectural theme
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT.jpg?resize=810%2C487)
Grove Street over
Spy Run Creek
Allen County Bridge No. 548
- Bridge rehabilitation
- Existing piles were reused
- New end bents and prestressed bulb-tee superstructure were constructed
- Site constraints, such as existing flag stone wall and adjacent intersection, were integrated into design
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-4.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-4.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-4.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-4.jpg?resize=810%2C487)
Yoder Road over I-69
- Design-build bridge rehabilitation project through INDOT
- Partial replacement of superstructure and substructure with full deck replacement
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT.jpg?resize=810%2C487)
Johnny Appleseed Memorial Bridge
INDOT LPA Project for
City of Fort Wayne
- Part of the River Greenway Trail System
- Sidewalk widening
- Custom handrail design
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/4-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/5-EDIT-RESIZE.jpg?resize=810%2C487)
US 35 over Long Branch Creek
INDOT - Fort Wayne District
- Small structure replacement
and extension of two-way
left turn lane on heavily
traveled US 35 - Cast-in-place wingwalls minimized structure length and reduced environmental impacts
- Phased construction utilized temporary traffic signals and temporary shoring
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-1.jpg?resize=810%2C487)
Old Lima Road over Willow Creek
Allen County Bridge No. 52
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/1-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/3-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/4-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/5-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/1-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/3-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/4-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/5-EDIT-1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-EDIT.jpg?resize=810%2C487)
Huntington County Roads over I-69
INDOT - Fort Wayne District
- CR 200 S, CR 300 E/CR 400 S, CR 900 S, and CR 1000 S over I-69 in Huntington County
- Hydrodemolition and installation of latex modified or microsilica concrete bridge deck overlays
- Drainage improvements adjacent to bridge end bents
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-3.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-3.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-3.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-3.jpg?resize=810%2C487)
Lincoln Way Road over Eel River
Whitley County Bridge No. 18
- Bridge rehabilitation project
- Portions of existing abutment reused and converted to semi-integral
- Deck and superstructure replaced with composite prestressed concrete bulb-tee beams
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-9.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-9.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-9.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-9.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-8.jpg?resize=810%2C487)
CR 600 E over
Solon Ditch
Whitley County Bridge No. 68
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
- Unique flared slab was detailed to accommodate adjacent intersection
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-10.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-10.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-9.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-10.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-10.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-9.jpg?resize=810%2C487)
SR 114 over branch of Calf Creek
INDOT - Fort Wayne District
- Small structure replacement project
- Custom designed grated box end sections
- Reduced construction cost and eliminated need for guardrail
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE-1.jpg?resize=810%2C487)
Ernst Road Improvements
Allen County Highway Department
- 1500' of full depth pavement reconstruction
- Aluminum box culvert replacement
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-6.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-6.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-5.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-6.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/9-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/10-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-6.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-6.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-5.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-6.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/7-EDIT-2.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/8-EDIT-1.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/9-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/10-EDIT.jpg?resize=810%2C487)
Fish Hatchery Road over Shriner Lake
Whitley County Bridge No. 109
- Bridge replacement project
- Single-span reinforced concrete slab bridge
- Cast-in-place concrete lake control spillway integrated into wingwall design
- Design of lake level control structure was coordinated with DNR
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-11.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-11.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-RESIZE-1.jpg?resize=810%2C487)
County Road 59 over Soloman Shank Ditch
Dekalb County Bridge No. 60
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
- Reinforced concrete hammerhead piers
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-6.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-3.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-3.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-7.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-6.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-3.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-3.jpg?resize=810%2C487)
Old State Road 327 over Black Creek
Dekalb County Bridge No. 103
- Bridge replacement project
- 3-span continuous reinforced concrete slab bridge
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-4.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/DSCN2971-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2018/03/1-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/2-EDIT-8.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/3-EDIT-7.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/4-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/5-EDIT-4.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2018/03/6-EDIT-4.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2018/03/DSCN2971-EDIT.jpg?resize=810%2C487)
Indiana Tech University
Snyder Academic Center
Fort Wayne, IN
- Features a central radiused stair with views outside and the 3 story rotunda inside
- Central domed roof structure
- Fast-tracked design/build schedule completed in 15 months
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0497-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0453-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_7997-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_5576-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_7962-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0497-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DSC_0453-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0046-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_7997-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_5576-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_7962-EDIT.jpg?resize=810%2C487)
Taylor University
Boren Campus Center
Upland, IN
- Two story steel framed, laterally supported with ordinary steel moment frames.
- Wrapped all 4 sides of existing Rediger Chapel and separated with expansion joints.
- Tiered auditorium utilizing steel raker beams and precast concrete risers.
- Existing foundations required cantilevered roof and floor structure.
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/001_100_9084-No-Shadow-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/002_100_9079-No-WT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/003_100_9087-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_9092-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/005_001.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/004_054.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/001_100_9084-No-Shadow-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/002_100_9079-No-WT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/003_100_9087-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_9092-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/005_001.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/004_054.jpg?resize=810%2C487)
Indiana Tech University
Law School
Fort Wayne, IN
- 3 story building with exposed radiused roof decking at 3rd floor
- Features courtroom with tiered seated and domed roof
- Fast-tracked design/build schedule
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IT-Law-School.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0006-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_0043-EDIT-w-crop.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website1a-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website1-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IT-Law-School.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0006-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/100_0043-EDIT-w-crop.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website3-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website1a-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/website1-EDIT.jpg?resize=810%2C487)
Turnstone
"Big Dream"
Fort Wayne, IN
- Fully ADA compliant site to accommodate the facility use.
- New public road to facilitate site access and local connectivity.
- Multiple parking lots including bus parking and loading areas.
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/Turnstone-3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IMG_0315-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IMG_0300-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/Turnstone-3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IMG_0315-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/IMG_0300-EDIT-RESIZE.jpg?resize=810%2C487)
Dekalb YMCA
Soccer Complex
Auburn, IN
- 40+/- acre soccer complex with 9+ soccer fields, including one artificial turf competition playfield.
- Included utility main extensions and regional detention.
- Incorporated decorative wet pond to control development runoff as well as 280+ acres of upstream watershed.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0026-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0021-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0015-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0026-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0024-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0021-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/11/DJI_0015-EDIT-RESIZE.jpg?resize=810%2C487)
UV Disinfection Improvements
Ossian, IN
- Project replaced existing failing ultraviolet disinfection equipment at wastewater treatment plant.
- Coordinated with Owner's selected equipment manufacturer to ensure existing UV channel structure could be reused.
- Expedited design, permitting, bidding, and construction schedule.
- Design allowed for flow to be maintained through existing structure during installation of new equipment.
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_6577-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_6895-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/20160408_144404-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1972-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_6577-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_6895-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/20160408_144404-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1972-EDIT.jpg?resize=810%2C487)
Roe Street
Storm Sewer
Ossian, IN
- Installation of 1,000 LF of storm sewer to replace existing undersized storm sewer.
- Relieved chronic storm sewer surcharging and overland flow.
- Pipe sizes ranged from 30" diameter down to 18" diameter.
- Re-connection of private storm sewer laterals and drainage tiles.
- Protection of existing utilities in congested existing utilities corridor.
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_4739-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/KIMG0057-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_4521-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_4739-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/KIMG0057-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/SAM_4521-EDIT.jpg?resize=810%2C487)
The Harrison
Fort Wayne, IN
- Four story mixed use building with below grade parking.
- Two levels of steel construction over cast-in-place concrete pan joist floor system.
- Laterally supported by a combination of concrete, CMU, and wood shear walls.
- Inset steel framed balconies on 3rd and 4th floors overlooking the ballpark.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_1296-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_1114-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_7828-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Harrison-7-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_1296-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_1114-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_7828-EDIT.jpg?resize=810%2C487)
Turnstone Plassman Athletic Center
Fort Wayne, IN
- PEMB fieldhouse with conventional steel mezzanine.
- Natatorium framed with precast double tees bearing on CMU walls.
- Unique entry canopy which includes multi-rolled column feature to incorporate part of client's logo.
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1179-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-003-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-2-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_1179-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-006-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-003-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/Turnstone-5-EDIT-RESIZE.jpg?resize=810%2C487)
Kokomo WWTP
- Centrifuge installation for waste solids processing to replace belt filter press
- Retrofit sludge pump gallery with modern positive displacement pumps
- Reduced solids hauling costs
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8567belt-filter.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8570-pumps.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8542-belt-filter.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8544-haul-off.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/20161011_101343-haul-off.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8567belt-filter.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8570-pumps.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8542-belt-filter.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/IMG_8544-haul-off.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/05/20161011_101343-haul-off.jpg?resize=810%2C487)
Jackson R. Lehman YMCA
Fort Wayne, IN
- 70,000 sq. ft. YMCA facility
- PEMB gym/fieldhouse with castellated beams, conventional steel, and CMU for remainder of the building
- Accommodated large openings in pool area and added volume in the lobby space
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/DJI_0002-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/DJI_0015.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/Lehman-Pool-Complete.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_7888.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/IMG_1402.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/IMG_1399.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/DJI_0002-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/DJI_0015.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/Lehman-Pool-Complete.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_7888.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/IMG_1402.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/04/IMG_1399.jpg?resize=810%2C487)
Stonebridge Business Park- Water Distribution
- Municipal utility extensions for 192 acre commercial / industrial business park
- 5,200 LF Water main
- IDEM public sewer main permitting
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6163-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6180-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6183-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6127-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6163-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6180-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6183-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/04/100_6127-EDIT.jpg?resize=810%2C487)
PFW Chilled Water Distribution Infrastructure Renovations
Fort Wayne, IN
- Repaired 3500 feet of aging carbon steel chilled water pipes with cured in place pipe (16" to 24")
- One of the first pressure pipe uses of this technology in the region
- Replaced laterals and air valves
- Installed in main campus corridor
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMG_20140609_095636_376-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMAG1691-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMAG1737-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMG_20140609_095636_376-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture1-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/03/Capture2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMAG1691-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/IMAG1737-EDIT.jpg?resize=810%2C487)
Angola Innovation Park
Angola, IN
- +/- 59 acre site of Certified Technology Park
- Included sanitary sewer, water main, storm sewer, and storm water detention facilities
- Road and lot grading incorporating earthwork balancing
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-12-04-Webcam-west-EDIT.jpg?resize=810%2C476)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-11-20-webcam-EDIT.jpg?resize=810%2C476)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-11-09-west-EDIT.jpg?resize=810%2C479)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-10-17-west-EDIT.jpg?resize=810%2C477)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-09-26-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-09-11-1-trimmed-EDIT.jpg?resize=810%2C462)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-12-04-Webcam-west-EDIT.jpg?resize=810%2C476)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-11-20-webcam-EDIT.jpg?resize=810%2C476)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-11-09-west-EDIT.jpg?resize=810%2C479)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-10-17-west-EDIT.jpg?resize=810%2C477)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-09-26-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2019/04/2017-09-11-1-trimmed-EDIT.jpg?resize=810%2C462)
Ossian Water Main Improvements
- Design and Construction inspection for 2,000LF of water main improvements
- Part of Ossian's planned water utility maintenance program
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5031-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5010-EDIT.jpg?resize=765%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5002-EDIT.jpg?resize=652%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/20150828_132832-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5031-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5010-EDIT.jpg?resize=765%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/SAM_5002-EDIT.jpg?resize=652%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/20150828_132832-EDIT.jpg?resize=810%2C487)
Ossian Industrial Park
- Design and Construction inspection for 2,000LF of water main improvements
- Jack and bore installation under the railroad
- Provided municipal drinking water and fire protection to industry on the west side of the tracks
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park4.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park1.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park2.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park3.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ossian-Ind-Park4.jpg?resize=810%2C487)
Indiana Wesleyan University – Felton St.
- Street Upgrades
- Drop off zones added
- Park and Landscape beds added
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Picture-033-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-028-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-026-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Picture-034-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-029-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Picture-033-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-028-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-026-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Picture-034-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-029-EDIT.jpg?resize=810%2C487)
Trine University Fieldhouse
Angola, IN
- Traffic control for vehicles and pedestrians
- Storm water drainage plan with swales
- Hardscape design
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Trine-9-18-09-020-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Trine-9-18-09-023-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse4-EDIT.jpg?resize=640%2C480)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Trine-9-18-09-020-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Trine-9-18-09-023-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse2-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse3-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/fieldhouse4-EDIT.jpg?resize=640%2C480)
Harrison Square Roadway Improvements
- Traffic impact study as part of the Parkview Field
- Traffic sign design
- Pedestrian movement related to the ballpark
- Overall project investment for the area exceeded $50 million
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-002-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-008-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-013-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-023-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-002-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-008-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-013-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2009-10-13-023-EDIT.jpg?resize=810%2C487)
LDM Foods
Yorkton, Saskatchewan, Canada
- Numerous building design for the $80 million facility
- 6 story structural steel building with braced bays
- Project utilized Canadian Codes
- Special foundation systems
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/LDM-1-EDIT-1024x683-NO-TS.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ariel-EDIT.jpg?resize=693%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Refinary1-EDIT2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/LDM-Jan-16-09-022-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/LDM-1-EDIT-1024x683-NO-TS.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Ariel-EDIT.jpg?resize=693%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Refinary1-EDIT2.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/LDM-Jan-16-09-022-EDIT.jpg?resize=810%2C487)
DeKalb Memorial Hospital
Auburn, IN
- Approximately $10+ million project
- 60,000 total square feet
- Reinforced concrete slabs, joist, and columns
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_1786-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2806-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2789-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-26-07-009-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-26-07-007-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/dekalb-hospital-010-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_1786-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2806-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2789-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-26-07-009-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/6-26-07-007-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/dekalb-hospital-010-EDIT.jpg?resize=810%2C487)
Indiana Wesleyan University Chapel
Marion, IN
- $15 million project with 75,000 total square feet
- 3200 seat Auditorium on tiered seating
- Long span structural steel
- Steel braced frames for lateral design
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Chapel1-EDIT-e1509043889871.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/interior-str-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2626-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-011-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-014-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/Chapel1-EDIT-e1509043889871.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/02/interior-str-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/02/100_2626-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-011-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/02/2010-05-28-014-EDIT.jpg?resize=810%2C487)
Kosciusko YMCA
- New facility over $6 million
- New roadway, parking lots, and traffic flow patterns
- Detention basin and sanitary lift station
- Trails and outdoor play area
IU Health Goshen Hospital -
Family Medicine and Urgent Care
Goshen, IN
- Single story 15,000 square feet steel framed medical facility.
- Incorporated hidden supplemental steel framing in stud walls to support large window openings.
- Large drive-through canopy spanning over 32 feet.
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_6705-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_6702-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0694-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0717-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_6705-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/10/100_6702-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0694-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/10/IMG_0717-EDIT.jpg?resize=810%2C487)
Brotherhood Mutual
Fort Wayne, IN
- $3.7 million project with 56,000 square feet
- 3 Story steel structure
- Moment frames for lateral design
- Bridge design over detention basin
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0331-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0357-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/100_0033-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/3-18-10-006-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Picture-3-4-10-7-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/2-18-10-045-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/2-18-10-004-EDIT-RESIZE-1.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0331-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0357-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/100_0033-EDIT-RESIZE.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/3-18-10-006-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/Picture-3-4-10-7-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/2-18-10-045-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/2-18-10-004-EDIT-RESIZE-1.jpg?resize=810%2C487)
PFW Dorms
- 23 acre Student Residence Hall site
- Stormwater detention
- Utility design of sanitary, water, and fire protection
- Site earthwork balance and poor soil analysi
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site4.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site3.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site2.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site1.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site4.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site3.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site2.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/IPFW-Dorm-Site1.jpg?resize=560%2C337)
IPFW Landscapes
- Plantings and design throughout campus
- Benches and gazebo for park like settings
- Buffer areas and screenings from parking lots and maintenance areas
- Numerous tree plantings lining the streets
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/LD1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/LD-new-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0421-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0422-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0434-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0420-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0417-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/LD1-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/LD-new-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0421-EDIT.jpg?resize=810%2C487)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0422-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0434-EDIT.jpg?resize=810%2C487)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0420-EDIT.jpg?resize=810%2C487)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/DSC_0417-EDIT.jpg?resize=810%2C487)
Marsh Supermarkets
- $8 million project
- Numerous truck dock and turning movements
- Stormwater detention ponds
- BMP- Soil erosion control
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh-final.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_stormwater3.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_stormwater4.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_Stormwater2.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh-final.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_stormwater3.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_stormwater4.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/marsh_Stormwater2.jpg?resize=560%2C337)
Goshen Memorial Hospital
- New Hospital Main entrance with canopy
- Increase parking lots and pedestrian movement
- Ambulance entrance
- Traffic control during construction
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/164762841517_GHS_11-29-06022.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/164762841517_GHS_11-29-06015.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/91875331517_GHS_11-29-06008.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/9187533100_3670.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/164762841517_GHS_11-29-06022.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/164762841517_GHS_11-29-06015.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/91875331517_GHS_11-29-06008.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/9187533100_3670.jpg?resize=560%2C337)
Rail Connect Business Park
- 118 acre Industrial park
- Lot layout and roadway design
- Regional detention basin for the Park
- Sanitary, Storm, and Water main designs
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_047.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_033.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_053.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_061.jpg?resize=560%2C337)
![](https://i2.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_047.jpg?resize=560%2C337)
![](https://i0.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_033.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_053.jpg?resize=560%2C337)
![](https://i1.wp.com/www.eri.consulting/wp-content/uploads/2017/01/412011782010-11-10_061.jpg?resize=560%2C337)
View More