We have experience to make your project a success. After 20 years, our project list is extensive. Please select an area of interest.
Projects
FlexJet Operations Center
Cleveland, OH
- Sloping columns throughout the perimeter of the building to create dramatic sloped architectural facades
- Cantilevered steel roof members to support extended rooftop elements pointing outward in multiple directions
- Laterally supported by steel braced frames
- Two story steel framed building with a partial basement
- $20 million construction cost
The Pearl
Fort Wayne, IN
- 2 levels of post-tensioned concrete for the podium structure with staged stressing of tendons
- 5 levels of load bearing cold formed steel walls above the podium with composite open web steel joists
- Elevated parking deck on the first level of post-tensioned concrete (flat slab construction)
- Post-tensioned transfer beams above the first level event space and commercial spaces
- Laterally supported by concrete shear walls
- $65 million construction cost - mixed use development
SIMCOM Aviation Training Facility
Lake Nona, FL
- Multiple second level elevations providing access to the full motion flight simulators
- Laterally supported by steel braced frames in various structural configurations to accommodate architectural and mechanical openings throughout the facility
- Two story steel framed building
- $40 million construction cost
Skyline Tower
Fort Wayne, IN
- Twelve story + penthouse building (5 structural steel, 8 load bearing cold formed steel wall panels).
- Concentric steel braced frames extend full height for lateral support.
- Rammed aggregate piers with uplift capacity at braced frames.
- Composite steel bar joists used for Levels 6-12.
The Bradley
Fort Wayne, IN
- Floor utilizes girder slab system with hollow core planks and special steel beams
- Rooftop patio and pergola
- Laterally supported by precast shear walls
- Five story steel framed building
View More